Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould

  • Audited Supplier
  • 7 yrs

Contact Supplier

Product Highlights

  • 30 Years Factory Experience: Direct manufacturer with 30 years of expertise in plastic injection mould production.
  • Full Customization Support: OEM/ODM services available with customization from samples, designs, or full custom options.
  • Wide Material Selection: Supports various plastics including PP, PC, PE, ABS, PVC, and mould steels like P20, H13, S136.
  • High Precision Manufacturing: Utilizes CNC, EDM, Wire Cut, and High Speed Carve for precise mould fabrication.
  • Strict Quality Control: 100% inspection process covering design, hardness, assembly, trial samples, and final packing.
  • Competitive Pricing: Offers competitive prices with high quality standards for industrial and household moulds.
  • Fast Delivery Options: Standard lead time 45-60 days; complex samples negotiable; off-season lead time one month.
  • Global Shipping Capability: Exports via Ningbo and Shanghai ports with flexible terms like FOB, CFR, CIF, and EXW.

Product Images of Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould

Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould pictures & photos
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
  • Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
    Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould

Find Similar Products

Product Description

 
Product Description


HEROMOULD is professional on CUSTOMIZED plastic injection mould & blowing mould 
   
Industrial moulds: Outdoor dustbin, Indoor dustbin, logistic pallet,pipe fitting,cable tie etc.
   
Household moulds: table,chair,stool,storage,baskets, crates, kitchenware etc.

   Appliance moulds: Washing machine, TV frame, Fan, Cooling machine etc.
  Car parts moulds: Car bumpers, head lamp, tail lamp 

 
Detailed Photos


Plastic Injection Moulds MotorCycle Safety Helmet  Parts  OEM Customized HERO MOULD

Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero MouldPlastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero MouldPlastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould






 

1.Product Description
1.Professional Newest Design
2. Competitive price, high quality.
3. Long Life.

Lead Time :
Design Normal design The complex sample
Est. Time(day) 45-90days To be negotiated

Description of HEROMOULD Plastic Injection Mould
 
Mould material 45#, P20, H13, 718, 2738, S136 etc.
Mould base As per customer's requirement
Cavity single/multi
Runner hot/cold
Mould life 50,0000-1,000,000shots
Design software UG, PROE, CAD, etc.
Plastic material PP, PC, PE, PS, PU, ABS, PVC, PA, POM, PMMA, PET, PPR etc.
Delivery time 45--60 days
Package Wooden Case
Delivery By Sea 
Specifications Depends on customer's requirements
Process Machine CNC, High Speed Carve, EDM, Wire Cut, Driller, Grin
 
The main Mold Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

 

 ABOUT HEROMOULD

 

 
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
 
SHOWROOM
 
 
 
 
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould

our exhibition
 
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould


Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould


Production process

 
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould
 
Plastic Injection Moulds Motorcycle Safety Helmet Parts OEM Customized Hero Mould


 

FAQ:

Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience 30 years. 

Q2: Where is your factory located?
A2: Heromould is located in Huangyan, Taizhou City, Zhejiang Province,China.  
50 minutes from Taizhou airport by car, 15 minutes from train station to our heromould factory.

Q3: How to go to your factory-Heromould?
A3:  by flight: Guangzhou→Taizhou (Luqiao airport)   1.5 hours
   by train: Shanghai→Taizhou Station             3.5 hours
   by bullet train: Ningbo→Taizhou Station         45minutes

Q4: What we need for mould quote?
A: 1) Mould steel raw material you require or mould life you require.
  1. Mould cavity no. you want ?
  2. 2D or 3D product drawing, or pictures with detail sizes information.
  (length, width, height, thickness), or send samples directly to us.
  1. Hot runner or cold runner, if hot runner which brand of hot runner you require
  2. Raw material of the product
  3. Sample quantity and packing.

Q5.: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
  1. Design Optimize Control
  2. Mould steel hardness Inspection
  3. Mould assembly Inspection.
  4. Mould trial samples inspection.
  5. Final inspection for mould & packing before shipment

For more detail information, kindly feel free to contact us. We will always be here to serve you!
And welcome you to visit HEROMOULD !
 



 
 
 

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2431020". Items marked "verified" are certified.

Watch Video
Watch Video
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.
TAIZHOU HUANGYAN HONGNUO MOULD CO., LTD.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
No. 18, Kaituo Road, Qili Wang Industrial Zone, Xinqian Street, Huangyan, Taizhou, Zhejiang, China
verified Plant Area
1400 square meters
verified Number of Employees
25
verified Registered Capital
300,000 RMB
verified Terms of Payment
T/T, LC
verified International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
verified Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
verified Nearest Port
Ningbo Port, Shanghai Port
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
30

Our Production Capability & Technical Expertise

verified Main Products
Mould
verified Production Lines
4
verified Production Machines
Drilling Machine, Grinding Machine
verified QA/QC inspectors
2 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Have instructions and uniformly followed
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
3 people
verified Traceability of Raw Materials
Yes

Our Industry Experience & Global Business Record

verified Year of Establishment
2009-09-07
verified Export Year
8 Years
verified Main Markets
South America, Europe, Southeast Asia/ Mideast, South Asia
verified Repeat Buyers Choice
80%~100%
verified Number of Foreign Trading Staff
4
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
Yes

Our Certifications, Standards & Industry Recognition

verified Cooperated with Fortune 500
No

FAQ

Are you a trading company or manufacturer?
We are a direct factory for making moulds with 30 years of experience.
Where is your factory located?
Heromould is located in Huangyan, Taizhou City, Zhejiang Province, China. It is 50 minutes from Taizhou airport by car and 15 minutes from the train station.
What information is needed for a mould quote?
We require mould steel/raw material requirements, mould life, cavity number, 2D/3D drawings or pictures with sizes, runner type (hot/cold), hot runner brand if applicable, raw material of the product, sample quantity, and packing details.
How do you ensure quality control?
We follow a strict process: Design Optimization, Mould Steel Hardness Control, Inspection, Mould Assembly Inspection, Mould Trial Samples Inspection, and Final Inspection for mould & packing before shipment.
What is the minimum order quantity?
The Minimum Order Quantity is 1 Set.
What are the payment terms?
We accept T/T and LC as terms of payment.
What is the lead time for production?
Standard lead time is 45-60 days. Complex samples are negotiable. Peak season lead time is 1-3 months, and off-season lead time is one month.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now