Plastic Injection Moulds Goblet Transparent PC Wine Glass Mould Glass Cup Mould Champagne Glass Mould Red Wine Glass Mould
1.Product Description
1.Professional Newest Design
2. Competitive price, high quality.
3. Long Life.
Lead Time :
Design |
Normal design |
The complex sample |
Est. Time(day) |
45-90days |
To be negotiated |
Description of HEROMOULD Plastic Injection Mould
Mould material |
45#, P20, H13, 718, 2738, S136 etc. |
Mould base |
As per customer's requirement |
Cavity |
single/multi |
Runner |
hot/cold |
Mould life |
50,0000-1,000,000shots |
Design software |
UG, PROE, CAD, etc. |
Plastic material |
PP, PC, PE, PS, PU, ABS, PVC, PA, POM, PMMA, PET, PPR etc. |
Delivery time |
45--60 days |
Package |
Wooden Case |
Delivery |
By Sea |
Specifications |
Depends on customer's requirements |
Process Machine |
CNC, High Speed Carve, EDM, Wire Cut, Driller, Grin |
The main Mold Steel and Hardness for you reference: |
Steel Grade |
S50C |
P20 |
P20HH |
718H |
2738H |
H13 |
S136 |
NAK80 |
Hardness(HRC) |
17-22 |
27-30 |
33-37 |
33-38 |
36-40 |
45-52 |
48~52 |
34-40 |
2. about HEROMOULD
SHOWROOM
3.our exhibition
4. Production process
FAQ:
Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience 30 years.
Q2: Where is your factory located?
A2: Heromould is located in Huangyan, Taizhou City, Zhejiang Province,China.
50 minutes from Taizhou airport by car, 15 minutes from train station to our heromould factory.
Q3: How to go to your factory-Heromould?
A3: by flight: Guangzhou→Taizhou (Luqiao airport) 1.5 hours
by train: Shanghai→Taizhou Station 3.5 hours
by bullet train: Ningbo→Taizhou Station 45minutes
Q4: What we need for mould quote?
A: 1) Mould steel raw material you require or mould life you require.
- Mould cavity no. you want ?
- 2D or 3D product drawing, or pictures with detail sizes information.
(length, width, height, thickness), or send samples directly to us.
- Hot runner or cold runner, if hot runner which brand of hot runner you require
- Raw material of the product
- Sample quantity and packing.
Q5.: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
- Design Optimize Control
- Mould steel hardness Inspection
- Mould assembly Inspection.
- Mould trial samples inspection.
- Final inspection for mould & packing before shipment
For more detail information, kindly feel free to contact us. We will always be here to serve you!
And welcome you to visit HEROMOULD !