• Plastic Nylon Cable Tie Mould From Heromould
  • Plastic Nylon Cable Tie Mould From Heromould
  • Plastic Nylon Cable Tie Mould From Heromould
  • Plastic Nylon Cable Tie Mould From Heromould
  • Plastic Nylon Cable Tie Mould From Heromould
  • Plastic Nylon Cable Tie Mould From Heromould

Plastic Nylon Cable Tie Mould From Heromould

Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Multi Cavity
Plastic Material: Nylon
Process Combination Type: Single-Process Mode
Application: Household Appliances, Commodity, Electronic, Home Use, Hardware
Customization:

Contact Supplier

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
cable tie 02
Runner
Hot Runner+Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
Mould Material
P20
Lifetime
500,000 Shots
Transport Package
Wooden Case
Specification
hardware
Trademark
HEROMOULD
Origin
Huangyan Taizhou, Zhejiang China
HS Code
84807190
Production Capacity
500 Set/Year

Product Description

HEROMOULD is professional on plastic injection mould,blowing mo
uld & plastic products

    Industrial moulds: Outdoor dustbin, Indoor dustbin, logistic pallet,pipe fitting,cable tie etc.
   Household moulds: table,chair,stool,storage,baskets, crates, kitchenware etc.
   Appliance moulds: Washing machine, TV frame, Fan, Cooling machine etc.
  Car parts moulds: Car bumpers, head lamp, tail lamp 


Plastic Products: Outdoor Dustbin, Indoor dustebin, Storages etc.


Plastic Nylon Cable Ties Injection Mold from HEROMOULD

Plastic Nylon Cable Tie Mould From Heromould
Plastic Nylon Cable Tie Mould From Heromould
Plastic Nylon Cable Tie Mould From Heromould
Plastic Nylon Cable Tie Mould From Heromould
Plastic Nylon Cable Tie Mould From Heromould
Plastic Nylon Cable Tie Mould From Heromould


1.Product Description
1.Professional Newest Design
2. Competitive price, high quality.
3. Long Life.

Lead Time :
Design Normal design The complex sample
Est. Time(day) 45-90days To be negotiated

Description of HEROMOULD Plastic Injection Mould
 
Mould material 45#, P20, H13, 718, 2738, S136 etc.
Mould base As per customer's requirement
Cavity single/multi
Runner hot/cold
Mould life 50,0000-1,000,000shots
Design software UG, PROE, CAD, etc.
Plastic material PP, PC, PE, PS, PU, ABS, PVC, PA, POM, PMMA, PET, PPR etc.
Delivery time 45--60 days
Package Wooden Case
Delivery By Sea 
Specifications Depends on customer's requirements
Process Machine CNC, High Speed Carve, EDM, Wire Cut, Driller, Grin
 
The main Mold Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

2. about HEROMOULD
Plastic Nylon Cable Tie Mould From Heromould

SHOWROOM
Plastic Nylon Cable Tie Mould From Heromould

Plastic Nylon Cable Tie Mould From Heromould

3.our exhibition
Plastic Nylon Cable Tie Mould From Heromould

4. Production process

Plastic Nylon Cable Tie Mould From Heromould

Plastic Nylon Cable Tie Mould From Heromould



FAQ:

Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience 30 years. 

Q2: Where is your factory located?
A2: Heromould is located in Huangyan, Taizhou City, Zhejiang Province,China.  
50 minutes from Taizhou airport by car, 15 minutes from train station to our heromould factory.

Q3: How to go to your factory-Heromould?
A3:  by flight: Guangzhou→Taizhou (Luqiao airport)   1.5 hours
   by train: Shanghai→Taizhou Station             3.5 hours
   by bullet train: Ningbo→Taizhou Station         45minutes

Q4: What we need for mould quote?
A: 1) Mould steel raw material you require or mould life you require.
  1. Mould cavity no. you want ?
  2. 2D or 3D product drawing, or pictures with detail sizes information.
  (length, width, height, thickness), or send samples directly to us.
  1. Hot runner or cold runner, if hot runner which brand of hot runner you require
  2. Raw material of the product
  3. Sample quantity and packing.

Q5.: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
  1. Design Optimize Control
  2. Mould steel hardness Inspection
  3. Mould assembly Inspection.
  4. Mould trial samples inspection.
  5. Final inspection for mould & packing before shipment

For more detail information, kindly feel free to contact us. We will always be here to serve you!
And welcome you to visit HEROMOULD !
 




 

Send your message to this supplier

*From:
*To:
avatar Mr. Amigo
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now