• 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
  • 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
  • 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
  • 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
  • 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
  • 8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould

8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould

Material: Plastic
Type: Pedal Bin
Usage: Home
Customized: Non-Customized
Color: Beige, Coffee, Black
Feature: Eco-Friendly
Samples:
US$ 5/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
8601
Size
8L--28*20*29.5cm 10L--28*20*33.5cm
Transport Package
Carton Packing
Specification
8L/10L/15L/20L
Trademark
n/m
Origin
Taizhou
HS Code
39269090
Production Capacity
1000PCS/Day

Product Description

8601 plastic indoor pedal trash bins 8L 10L 15L 20L

Item No.: 8601
Capacity:  8L 10L 15L 20L
Weight:  8L-- 630g  ,10L--660g
material: PP
Packing size: 8L--28*20*29.5cm ,  10L--28*20*33.5cm
Color available: Beige, Coffee & Black.
MOQ: 3000pcs/customized color, and mixed items into full shipping container
 factory avaiable color: 500pcs and mixed items into full shipping container

We supply different kinds of home use trash bins and outdoor trash bins. 

plastic square household baskets with handle mould from HEROMOULD

1.Product Description

1.Professional Newest Design
2. Competitive price, high quality.
3. Long Life.


 

Lead Time :
Design Normal design The complex sample
Est. Time(day) 45-90days To be negotiated

Description of  HEROMOULD Plastic Injection Mould  
 
Mould material 45#, P20, H13, 718, 2738, S136 etc.
Mould base As per customer's requirement
Cavity single/multi
Runner hot/cold
Mould life 50,0000-1,000,000shots
Design software UG, PROE, CAD, etc.
Plastic material PP, PC, PE, PS, PU, ABS, PVC, PA, POM, PMMA, PET, PPR etc.
Delivery time 45--60 days
Package Wooden Case
Delivery By Sea 
Specifications Depends on customer's requirements
Process Machine CNC, High Speed Carve, EDM, Wire Cut, Driller, Grin
 
The main Mold Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

ABOUT HEROMOULD
 
8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
SHOWROOM

8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould

 
Our Exhibition
 
8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould
 
Production process

8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould

8601 Plastic Indoor Pedal Trash Bins 8L 10L 15L 20L Heromould




FAQ:

Q1: Are you trading company or manufacturer?
A1: We are direct factory for making mould with experience 30 years. 

Q2: Where is your factory located?
A2: Heromould is located in Huangyan, Taizhou City, Zhejiang Province,China.  
50 minutes from Taizhou airport by car, 15 minutes from train station to our heromould factory. 


Q3: How to go to your factory-Heromould? 
A3:  by flight: Guangzhou→Taizhou (Luqiao airport)   1.5 hours
   by train: Shanghai→Taizhou Station             3.5 hours 
   by bullet train: Ningbo→Taizhou Station         45minutes

Q4: What we need for mould quote?
A: 1) Mould steel raw material you require or mould life you require.
  1. Mould cavity no. you want ?
  2. 2D or 3D product drawing, or pictures with detail sizes information.
  (length, width, height, thickness), or send samples directly to us.
  1. Hot runner or cold runner, if hot runner which brand of hot runner you require
  2. Raw material of the product
  3. Sample quantity and packing.

Q5.: How about quality control in your factory?
A: We believe "Quality comes before everything". We mainly do the following procedures:
  1. Design Optimize Control
  2. Mould steel hardness Inspection
  3. Mould assembly Inspection.
  4. Mould trial samples inspection.
  5. Final inspection for mould & packing before shipment


For more detail information, kindly feel free to contact us. We will always be here to serve you!
And welcome you to visit HEROMOULD !
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now